Projects & Monitoring · per month
Project Monitoring
Sending money to a site every month and hearing nothing is the normal way these projects fail. Monitoring puts a person on the ground one to three times a week: filming what has changed, talking to the people doing the work, and checking your own short list of things you said you wanted to see.
- ₦500,000
- $370
- £290
- Monthly contract · 1–3 visits a week, agreed with you
Price
₦500,000
per month · or $370 · £290
Published floor for one site, one city, up to two visits a week. A third weekly visit, a second site or travel outside the city is quoted. Minimum one month.
- Turnaround
- Monthly contract · 1–3 visits a week, agreed with you
- Coverage
- All 36 states + FCT
- Account needed
- No
What we do on the ground
- One to three visits a week, set by you at the start and adjustable
- Live video call from site so you see it yourself, not after editing
- Photographs of progress, materials on site and workmanship
- Short interviews with workers, the site supervisor or the contractor
- Progress against your own checklist of up to ten items
- A written monthly report, plus a message after every visit
- Receipts and delivery notes for materials where they are available
What comes back to you
Proof is the product. Written words can be argued with; a timestamped video and a receipt cannot.
- A message after each visit, same day
- Live video, plus original footage files
- A signed monthly report with photographs and your checklist scored
- Anything we were blocked from seeing, written down rather than skipped
What we need from you
Send what you have. If something is missing we tell you before the job starts, not halfway through it.
- 01Site address, with the nearest landmark
- 02Contractor or supervisor name and phone number
- 03Your checklist — up to ten things you want checked each visit
- 04Drawings, bill of quantities or contract, if you have them
- 05A government ID for you
- 06A signed letter of authority naming us as your representative on site
Documents are uploaded against your tracking number, stored privately, and deleted after the mandate closes. Nobody without the number can see them.
How it runs
Step 1
You set the brief
Site, duration, how often we visit and the ten things you want watched.
Step 2
We quote
A monthly figure, with travel outside the city shown separately.
Step 3
First month to start
Visits begin once the first month is settled.
Step 4
Visits and messages
Same-day note after every visit, with video and photographs.
Step 5
Monthly report
A signed report, then the next month is invoiced.
What this service is not
- We report progress. We do not supervise, instruct or pay workers, and we do not certify that work is to standard.
- We never hold project funds. You pay contractors directly.
Questions people ask before booking this
- How much does project monitoring cost in Nigeria?
- The published floor is ₦500,000 a month, $370 or £290, for one site in one city and up to two visits a week. That figure covers fuel, a vehicle, the field team and the reporting. Three visits a week, a second site or a site outside the city is quoted before we start.
- How often will you visit the site?
- You choose at the start: once, twice or three times a week. We suggest twice for most building work, and three when the stage is critical or money is moving quickly. It can be changed between months.
- Can you send live video while you are on site?
- Yes. We call you from the site so you see the work as it is, not a clip chosen afterwards. The original footage is sent as well.
- Do you talk to the workers and the contractor?
- Yes. We ask what stage they are on, what is next and what is holding them up. We write down what they said, attributed, and we do not repeat it as fact.
- Can you monitor a project in another state, or an oil and gas site?
- Yes, anywhere in Nigeria, including the North and the Niger Delta. Travel and any site access requirements are quoted before the first visit. Some sites require induction or permits — tell us early and we will handle it.